1. What is the other term used for reference table?
A    :   Dictionary
B    :    Biography
C    :    Bibliography
D    :    Information Table

2. Which hand book referred by machine engineer?
A    :   Parryʹs cheorikal
B    :    CRC
C    :   Mark standard
D    :    Oxford Dictionary

3. What is a hand book?
A    :   Model book of various works
B    :    Type of reference work or other collection of instruction
C    :   Design book of latest works
D    :    Dictionary of materials

4. Which standard schedule of rates to be considered for estimation?
A    :    Standard schedule of rates of the last year
B    :    Standard schedule of rates of the average of the last 10 years
C    :    Standard schedule of rates of the average of last 5 years
D    :    Standard schedule of rates of the current year

5. What is an over estimate?
A    :    When an estimate is exceeded to actual estimate
B    :   When an estimate is fell short of the actual estimate
C    :    When an estimate perfectly matches the actual estimate
D    :    No work started as per estimate

6. What is a under estimate?
A    :    No work started as per estimate
B    :    An estimate perfectly matches with actual
C    :    An estimate is fell short of the actual estimate
D    :    An estimate is exceeded the actual estimate

7. What is the term used for the method of calculating various quantities and expenditure on a particular job or process?
A    :    Estimation
B    :   Drawing
C    :    Specification
D    :    Plan

8. What is the main factor to be considered while preparing a detailed estimate?
A    :    Shape of material
B    :    Brand of the materials
C    :    Quantity, availability and transportation of materials
D    :    Location of material

9. Which authority publishes schedule of rates?
A    :    Individual
B    :    Corporate
C    :   Partnership firm
D    :    Government department

10. What is the name of a booklet, the rates of various terms are indicated?
A    :   Price bank
B    :   Price bunch
C    :   Price tag
D    :    Price catalogue

11. What is the term, for the details of materials, brand name, grade of quality, rating of current and voltage etc.?
A    :   Drawing
B    :    Specification of materials
C    :    Raw materials
D    :    Price catalogue

12. What is the use of engineering drawing?
A    :    For estimation of material and execution of work
B    :    For colourful appearance
C    :    For reducing the cost
D    :    For increasing the cost

13. What is the other term of pocket reference in engineering works?
A    :    Hand tool
B    :    Hand book
C    :    Good book
D    :    New book

14. Which one is related to estimation of work?
A    :    Bill of material
B    :   Packing
C    :    Information table
D    :    Hand book

15. What is a total cost?
A    :    Raw material cost only
B    :   Machining cost only
C    :    Raw materials cost and machining cost
D    :    Advertisement cost only

16. Who prepares the cost of estimation?
A    :    Operator
B    :    Quality Inspector
C    :    Estimator
D    :    Draughts man

17. Which one is included in machining estimation sheet?
A    :    Transport cost
B    :    Advertisement cost
C    :    Raw material cost
D    :    Tax

18. What is the minimum permissible size of aluminium wire used in estimation?
A    :    1.5 sq.mm
B    :   2.5 sq.mm
C    :   5 sq.mm
D    :    3.5 sq.mm

19. What is the minimum permissible area of conductor (U/G cable) for three and half cores cable?
A    :    25 sq.mm
B    :   50 sq.mm
C    :   5 sq.mm
D    :    100 sq.mm

20. Which one is the most reliable estimate?
A    :   Preliminary estimate
B    :   Plinth area estimate
C    :    Cube rate estimate
D    :    Detailed estimate

21. Which IE rules are to be verified on completion of wiring on any new installation?
A    :    IE Rules, 1956
B    :    IE Rules, 1960
C    :    IE Rules, 1961
D    :    IE Rules, 1967

22. What describes the detailed specification for the item of work?
A    :    Quality, Quantity, Workmanship, Method of execution
B    :    Colour
C    :    Tax, Transport, Overhead expenses
D    :    Maintenance, Stock, Cost

23. Which of the impurity in cast iron makes it hard and brittle?
A    :    Silicon
B    :    Sulphur
C    :   Manganese
D    :    Phosphorus

24. What cables are used for 132KV lines?
A    :    High tension
B    :    Super tension
C    :    Extra high tension
D    :    Extra super voltage

25. Which specification is other than general specification?
A    :    Brief specification
B    :    Bulk specification
C    :   Detailed specification
D    :    Main specification

26. What percentage of water absorbed by a good building stone?
A    :    Less than 10%
B    :   Less than 20%
C    :    Less than 8%
D    :    Less than 5%

27. What is the relative permittivity of rubber?
A    :    Between 2 and 3
B    :    Between 5 and 6
C    :    Between 8 and 10
D    :    Between 12 and 14

28. What is the weight of the iron ball has volume of 250 cc and density 7.5 gm/cc?
A    :    1750 gram
B    :   1875 gram
C    :   1975 gram
D    :    1785 gram

29. What is the weight of a rectangular block of a cost iron of 250cm X 20cm X 8cm (density of cast iron is 7.8 gm/cm³)?
A    :    312 kg
B    :   372 kg
C    :   410 kg
D    :    525 kg

30. What is the total estimation cost for making the component of 8 drilled hole dia 10 mm and 4 Numbers of M6 taps in the plate, if Rs.8/- per drilled holes and Rs.12 per drill and tap?
A    :    Rs.102
B    :    Rs.100
C    :    Rs.112
D    :    Rs.110

31. What is the estimation of milling cost of a rectangular block size 100 X 80 X60 mm, if cost of the milling is Rs.2/sq.cm?

A    :    Rs.652/-
B    :    Rs.752/-
C    :    Rs.572/-
D    :    Rs.960/-

32. What is the total wattage in a room if 2 tube lights of 50W rating, 2 fans of 80W rating, 2 numbers of light points of 60W rating, one fan point of 60W rating and one 3 pin socket of 100W rating?
A    :    340 W
B    :   440 W
C    :   540 W
D    :    640 W

33. What is the total labour charges for a particular wiring work completed in 2 days by one electrician and one helper.(Electrician @ ₹800/day and helper @ ₹ 400/day)
A    :    Rs. 2000
B    :    Rs. 2400
C    :    Rs. 3000
D    :    Rs. 1400

34. What is the total cost of painting of a class room including ceiling, if the size of length is 6m, breadth is 5m and height is 4m. (Painting + labour cost Rs.150/- per sq.m)
A    :    Rs.15000/-
B    :    Rs.16700/-
C    :    Rs.17700/-
D    :    Rs.18700/-

35. What is the total cost to assemble 10 personal computer systems, spares cost as given for one system: 1 TB hard disc Rs.4500/-, Intel i3 mother board Rs.7000/-, SMPS Rs.2500/-, monitor Rs.6000/-, keyboard Rs.1000/-, other material cost (Switches, USB, Cables etc.,) Rs.6500/-?
A    :    Rs.275000/-
B    :    Rs.250000/-
C    :    Rs.225000/-
D    :    Rs.265000/-

36. What is the total construction cost of a house construction area of 3000 sq.ft. (cost of construction Rs.2000/- per sq.ft including material and labour)?
A    :    Rs.30,000,000
B    :    Rs.60,00,000
C    :    Rs.6,00,000
D    :    Rs.6,000,000

37. What is the total cost of Air-conditioners installed in a college, 40 class room-each 1 Air- conditioner, Computer lab 5 Air- conditioners and conference hall 5 Air-conditioners (Cost of one air conditioner Rs.30000/- including installation)?
A    :    Rs.10 lakhs
B    :    Rs. 20 lakhs
C    :    Rs. 12 lakhs
D    :    Rs. 15 lakhs

38. What is the total estimation cost for mandrel, if density is 7.8 gm/cm² and material cost is Rs.240 kg?
A    :    0.65 kg
B    :   0.90 kg
C    :   0.70 kg
D    :    0.75 kg

39. What is the estimation of labour charge for making inside square of size 30 X 30 mm, if making charge Rs.500/10cm²?
A    :    Rs.500/-
B    :    Rs.450/-
C    :    Rs.350/-
D    :    Rs.400/-